Wednesday, November 16, 2011

November 16th 2011 Titan Home Improvements

So it has been over a month since we did the Home show, things have been very busy and soon approaching us are the holidays. The Home show was a great event and we meet a lot of new contacts. We just got done doing a room enclosure that we where able to complete in two weeks it included : framing, running electrical, drywall, windows, door and painting. We are currently working on installing 16" x 16" tile in a master shower.
Thanks for checking in see you next time as always give us a call with any needs you may have around the house.
Titan Home Improvements - 602-999-0308

Tuesday, September 27, 2011

Home Show Preparation

Getting everything together for the home show that starts on Friday. Come out to the Arizona home and garden show at the state fairgrounds and visit us at booth #861. It is going to be a good event and plenty of exposure.
See ya there. I still have a few tickets if you are interested.

Saturday, August 13, 2011

8/13/11

Current update, for the last two months remodeling has been slow due to summer break and family vacations so we have been doing odd ball jobs: painting, adding door hardware for cabinets, faucets, drywall repairs, hang light fixtures, installing doggy doors, hanging TV's etc. Remember Titan Home Improvements does it all no job to small. We can take care of all your needs under the roof. Give us a call.

Tuesday, May 24, 2011

Week end review 5-19-11

Rebuild a 14 x 14 room addition down to the framing.

Week end review 5-13-11

Install 600sq' of tile on a patio

Week end review 5-6-11

This week we installed can lights and granite tile counter tops at one location and did a small bath remodel ( change out vanity, sink, faucet, mirror, light and new toilet

Friday, April 29, 2011

Home Remodel

So it has been a while since i have posted i have been working on a home in chandler for the last five weeks doing the following: Painting entire inside, remodeled all 4 bathrooms, changed all plumbing and lighting fixtures, granite counter tops in bathrooms add can lights in family room and knobs throughout the home.

Sunday, March 27, 2011

Misc update

So it has been three weeks since i made an update been busy with misc projects here we go: painting, hanging mirrors, vanity lights, drywall repairs, garage floor epoxy and light fixtures

Sunday, February 27, 2011

Week end review 2-27-11

Week end review:
Lets see we installed a exterior laundry room door and double French security door.
Another job we painted two bedrooms, remove 250' of base molding and replaced with a 6" moldings.

Thursday, February 17, 2011

Hall Tile

This weeks project install tile in a hallway in a pinwheel pattern.

Saturday, February 12, 2011

Friday Plumbing

Friday we put in new angle stops for a kitchen, install new faucet, and reattached all plumbing after granite was installed

Tuesday, February 8, 2011

Bathroom Tile

Project for the week is remove laminate flooring and install 24" x 12 " porcelain tile on a brick  offset pattern.